Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 269
Message text: Order &2 requires &1 more than once
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT269
- Order &2 requires &1 more than once ?The SAP error message
/SAPAPO/CDPSOPT269 Order &2 requires &1 more than once
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the order's requirements in the planning process. This error indicates that a specific order (identified by &2) is requesting a certain resource or component (identified by &1) more than once, which is not allowed in the current configuration or planning scenario.Cause:
- Duplicate Requirements: The order is trying to consume a resource or component multiple times, which may not be configured to allow such duplication.
- Configuration Issues: The settings in the APO system may not be correctly set up to handle the specific requirements of the order.
- Data Integrity Issues: There may be inconsistencies in the master data or transaction data that lead to this error.
- Planning Strategy: The planning strategy being used may not support the requirement of the order.
Solution:
- Check Order Requirements: Review the order in question to ensure that it is not mistakenly set up to require the same component or resource multiple times.
- Review Master Data: Ensure that the master data for the materials, resources, and orders is correctly configured and does not contain duplicate entries or incorrect settings.
- Adjust Planning Parameters: If applicable, adjust the planning parameters or strategies to allow for the required consumption of resources or components.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to the order and its requirements.
- Debugging: If the issue persists, consider debugging the planning run to identify where the duplication is occurring and address it accordingly.
- Contact SAP Support: If you are unable to resolve the issue, consider reaching out to SAP support for assistance, providing them with the error message and context.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/CDPS
(for detailed scheduling) to analyze the order and its requirements.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT268
Activity &1 has time relationships that are not valid
Actvitity &V1& has time relationships of type &V2& via modi but no time relationships via activities.Error message extract from SAP s...
/SAPAPO/CDPSOPT267
Order &1: continuous load not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT270
Activity &1 exceeds the capacity of resource &2 in mode &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT271
Activity &1 has multiple predecessors
Activity &V1& has activity &V2& as a multiple predecessor of type &V3&.System Response This situation does not influence the...
Click on this link to search all SAP messages.