Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 268
Message text: Activity &1 has time relationships that are not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT268
- Activity &1 has time relationships that are not valid ?The SAP error message /SAPAPO/CDPSOPT268 indicates that there are invalid time relationships for a specific activity in the SAP Advanced Planning and Optimization (APO) module. This error typically arises during planning or scheduling processes when the system detects that the defined time relationships for an activity do not conform to the expected rules or constraints. Cause The error can be caused by several factors, including: Incorrect Time Settings: The start and end times of the activity may overlap with other activities or may not be set correctly. Missing Dependencies: There may be missing or incorrectly defined dependencies between activities that affect their scheduling. Resource Constraints: The resources assigned to the activity may not be available during the specified time frame.
Configuration Issues: There may be issues with the configuration of the planning object or the master data related to the activity. Solution To resolve the error, you can take the following steps: Check Activity Time Settings: Review the start and
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT267
Order &1: continuous load not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT266
Order &1: Setup activity has continuous consumption
What causes this issue? A setup activity from order &V1& has a continuous consumption. Setup activities can only consume material at the begi...
/SAPAPO/CDPSOPT269
Order &2 requires &1 more than once
What causes this issue? Resource &V1& is required by activity &V3& of the order more than once. A resource can only by reserved once ...
/SAPAPO/CDPSOPT270
Activity &1 exceeds the capacity of resource &2 in mode &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.