Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 240
Message text: Mode &2 for activity &1: Primary resource is not a single activity resrc.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT240
- Mode &2 for activity &1: Primary resource is not a single activity resrc. ?The SAP error message /SAPAPO/CDPSOPT240 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with resource allocation in a planning scenario. The message indicates that the primary resource specified for an activity is not a single activity resource, which is required for the planning process.
Cause: Resource Type Mismatch: The primary resource assigned to the activity is not defined as a single activity resource in the system. This could happen if the resource is defined as a capacity resource or a different type that does not meet the requirements for the specific planning activity. Incorrect Resource Configuration: The resource may not be configured correctly in the system, leading to the inability to use it as a primary resource for the specified activity. Planning Object Configuration: The planning object (like a production order or a planned order) may not be set up correctly, leading to the system not
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT237
Time Decomposition disabled
What causes this issue? Time Decomposition was enabled in the optimization profile (or has been enabled by the automatic), but another incompatible f...
/SAPAPO/CDPSOPT236
Predecessor for activity &2 in locked activity chain &1 is not valid
What causes this issue? The reference type of the activity &V2& in the locked activity chain &V1& for its predecessor is not Finish-S...
/SAPAPO/CDPSOPT241
Order &1: Multiple operations on bottleneck resources
What causes this issue? There are multiple operations or <DS:GLOS.34FC8091B6F6D311A4910060B03C3B0E>locked activity chains</> on a <DS:...
/SAPAPO/CDPSOPT242
Activity &1 and order &2: Remove time dependencies
What causes this issue? There are predecessor, successor, or pegging relationships between orders &V1& and &V2& on <DS:GLOS.35CB92...
Click on this link to search all SAP messages.