How To Fix /SAPAPO/CDPSOPT240 - Mode &2 for activity &1: Primary resource is not a single activity resrc.


/SAPAPO/CDPSOPT240 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 240

  • Message text: Mode &2 for activity &1: Primary resource is not a single activity resrc.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/CDPSOPT240 - Details

  • The SAP error message /SAPAPO/CDPSOPT240 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with resource allocation in a planning scenario. The message indicates that the primary resource specified for an activity is not a single activity resource, which is required for the planning process.
    
    Cause: Resource Type Mismatch: The primary resource assigned to the activity is not defined as a single activity resource in the system. This could happen if the resource is defined as a capacity resource or a different type that does not meet the requirements for the specific planning activity. Incorrect Resource Configuration: The resource may not be configured correctly in the system, leading to the inability to use it as a primary resource for the specified activity. Planning Object Configuration: The planning object (like a production order or a planned order) may not be set up correctly, leading to the system not

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/CDPSOPT240 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker