Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 241
Message text: Order &1: Multiple operations on bottleneck resources
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT241
- Order &1: Multiple operations on bottleneck resources ?The SAP error message
/SAPAPO/CDPSOPT241 Order &1: Multiple operations on bottleneck resources
typically occurs in the context of Advanced Planning and Optimization (APO) when there are scheduling conflicts due to multiple operations trying to use the same bottleneck resource at the same time. This can lead to inefficiencies in production planning and scheduling.Cause:
- Bottleneck Resource: A bottleneck resource is a resource that has limited capacity and is critical to the production process. When multiple operations are scheduled to use this resource simultaneously, it can lead to conflicts.
- Scheduling Conflicts: The error indicates that the system has detected that more than one operation is trying to access the same bottleneck resource at the same time, which is not allowed.
- Resource Capacity: The capacity of the bottleneck resource may not be sufficient to handle the demand from the operations scheduled.
Solution:
- Review Resource Allocation: Check the scheduling of operations that are trying to use the bottleneck resource. Ensure that operations are staggered appropriately to avoid conflicts.
- Adjust Capacity: If possible, increase the capacity of the bottleneck resource. This could involve adding more shifts, increasing working hours, or even investing in additional equipment.
- Change Operation Scheduling: Modify the scheduling of operations to ensure that they do not overlap on the bottleneck resource. This may involve rescheduling some operations to different time slots.
- Use Alternative Resources: If applicable, consider using alternative resources that can perform similar functions to alleviate the load on the bottleneck resource.
- Prioritize Operations: Implement prioritization for operations based on their importance or urgency, ensuring that critical operations have access to the bottleneck resource when needed.
- Check Configuration: Ensure that the configuration of the resource and operations in the system is correct. This includes checking the setup of the production process and the resource's capacity settings.
Related Information:
By addressing the underlying causes of the error and implementing the suggested solutions, you can resolve the issue and improve the efficiency of your production scheduling in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT240
Mode &2 for activity &1: Primary resource is not a single activity resrc.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT237
Time Decomposition disabled
What causes this issue? Time Decomposition was enabled in the optimization profile (or has been enabled by the automatic), but another incompatible f...
/SAPAPO/CDPSOPT242
Activity &1 and order &2: Remove time dependencies
What causes this issue? There are predecessor, successor, or pegging relationships between orders &V1& and &V2& on <DS:GLOS.35CB92...
/SAPAPO/CDPSOPT243
Activity &1 has more than one mode compatible link in the setup acts
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...