How To Fix /SAPAPO/CDPSOPT241 - Order &1: Multiple operations on bottleneck resources


/SAPAPO/CDPSOPT241 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 241

  • Message text: Order &1: Multiple operations on bottleneck resources

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT241 - Order &1: Multiple operations on bottleneck resources ?
    The SAP error message /SAPAPO/CDPSOPT241 Order &1: Multiple operations on bottleneck resources typically occurs in the context of Advanced Planning and Optimization (APO) when there are scheduling conflicts due to multiple operations trying to use the same bottleneck resource at the same time. This can lead to inefficiencies in production planning and scheduling.
    
    Cause: Bottleneck Resource: A bottleneck resource is a resource that has limited capacity and is critical to the production process. When multiple operations are scheduled to use this resource simultaneously, it can lead to conflicts. Scheduling Conflicts: The error indicates that the system has detected that more than one operation is trying to access the same bottleneck resource at the same time, which is not allowed. Resource Capacity: The capacity of the bottleneck resource may not be sufficient to handle the demand from the operations scheduled.
    Solution: Review Resource Allocation: Check the scheduling of operations that are trying to use the bottleneck resource.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker