Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 236
Message text: Predecessor for activity &2 in locked activity chain &1 is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT236
- Predecessor for activity &2 in locked activity chain &1 is not valid ?The SAP error message
/SAPAPO/CDPSOPT236
indicates that there is an issue with the predecessor activity in a locked activity chain within the SAP Advanced Planning and Optimization (APO) module. Specifically, it means that the predecessor for the specified activity is not valid, which can occur for several reasons.Causes:
- Locked Activity Chain: The activity chain is locked, which means that no changes can be made to it. This can happen if another user or process is currently working on it.
- Invalid Predecessor: The predecessor activity specified does not exist or is not valid in the context of the current activity chain.
- Data Inconsistency: There may be inconsistencies in the data related to the activity chain, such as missing or incorrect entries in the master data.
- Configuration Issues: There may be configuration issues in the APO system that prevent the predecessor from being recognized as valid.
Solutions:
- Check Activity Chain Lock: Verify if the activity chain is indeed locked. If it is, you may need to wait until the lock is released or contact the user who has locked it to make necessary changes.
- Validate Predecessor: Check the predecessor activity to ensure it exists and is correctly defined in the system. You can do this by navigating to the relevant planning book or activity chain and reviewing the settings.
- Review Data Consistency: Ensure that all relevant master data (like resources, activities, and their relationships) is correctly maintained and consistent. You may need to run consistency checks or data validation reports.
- Check Configuration: Review the configuration settings in the APO system to ensure that they are set up correctly for the activity chains and their predecessors.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/CDPS
(for activity chains) to investigate further.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or APO support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT235
There is no successor for activity &2 in locked activity chain &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT234
Mode &3 of actvy &2 in locked actvy chain &1 does not have a primary res.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT237
Time Decomposition disabled
What causes this issue? Time Decomposition was enabled in the optimization profile (or has been enabled by the automatic), but another incompatible f...
/SAPAPO/CDPSOPT240
Mode &2 for activity &1: Primary resource is not a single activity resrc.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.