How To Fix /SAPAPO/CDPSOPT235 - There is no successor for activity &2 in locked activity chain &1


/SAPAPO/CDPSOPT235 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 235

  • Message text: There is no successor for activity &2 in locked activity chain &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT235 - There is no successor for activity &2 in locked activity chain &1 ?
    The SAP error message /SAPAPO/CDPSOPT235 indicates that there is an issue with the scheduling of activities in a locked activity chain. Specifically, it states that there is no successor for a specified activity in the locked activity chain. This can occur in the context of Advanced Planning and Optimization (APO) when dealing with production planning and scheduling.
    
    Cause: Missing Successor Activity: The primary cause of this error is that the specified activity (denoted by &2) does not have a defined successor in the activity chain (denoted by &1). This could be due to incorrect configuration or data entry. Locked Activity Chain: The activity chain is locked, which means that no changes can be made to it while it is in this state. This can prevent the system from finding or assigning a successor. Data Integrity Issues: There may be issues with the data integrity in the planning book or the master data that defines

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker