Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 113
Message text: The newly created order &1 contains fixed activities
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT113
- The newly created order &1 contains fixed activities ?The SAP error message
/SAPAPO/CDPSOPT113
indicates that a newly created order contains fixed activities, which can lead to issues in scheduling and resource allocation within the Advanced Planning and Optimization (APO) module. Here’s a breakdown of the cause, potential solutions, and related information:Cause:
- Fixed Activities: The order in question has activities that are marked as fixed. Fixed activities are those that cannot be rescheduled or adjusted by the planning system. This can happen if the order was created with specific constraints or if it was manually set to be fixed.
- Planning Parameters: The planning parameters or settings in the APO system may not allow for the creation of orders with fixed activities under certain conditions.
- Resource Constraints: The resources associated with the order may have constraints that prevent the system from processing the order as expected.
Solutions:
- Review Order Configuration: Check the configuration of the order to see if the fixed activities can be modified. If they are not necessary, consider changing them to non-fixed activities.
- Adjust Planning Parameters: Review the planning parameters in the APO system. Ensure that the settings allow for the creation of orders with fixed activities if that is the intended behavior.
- Resource Availability: Verify the availability of resources associated with the order. If resources are constrained, consider adjusting the resource allocation or scheduling to accommodate the order.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling fixed activities in orders. This may provide insights into best practices or configuration settings that can be adjusted.
- Error Handling: If the error persists, consider implementing error handling procedures in your planning process to manage orders with fixed activities more effectively.
Related Information:
By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error message /SAPAPO/CDPSOPT113
and ensure smoother order processing in your SAP APO environment.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT112
Scheduling has scheduled some activities differently
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT111
Scheduling could not adopt the solution
What causes this issue? Optimization could not transfer the solution to scheduling. Therefore, the planning situation has not changed since optimizat...
/SAPAPO/CDPSOPT115
Resource &1: Calendar is not complete
What causes this issue? There are gaps in the resource &V1& calendar. The calendar has not been maintained up until the end of the optimizati...
/SAPAPO/CDPSOPT116
Resource &1: Calendar start is too late
What causes this issue? The calendar for resource &V1& has been maintained from a point in time after the optimization horizon has already be...
Click on this link to search all SAP messages.