How To Fix /SAPAPO/CDPSOPT116 - Resource &1: Calendar start is too late


/SAPAPO/CDPSOPT116 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 116

  • Message text: Resource &1: Calendar start is too late

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT116 - Resource &1: Calendar start is too late ?
    The SAP error message /SAPAPO/CDPSOPT116 Resource &1: Calendar start is too late typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the scheduling of resources. This error indicates that the start date of the calendar for the specified resource is set too late, which prevents the system from scheduling any activities or operations that require that resource.
    
    Cause: Calendar Configuration: The calendar for the resource may not be set up correctly. It could be that the start date of the calendar is after the planned start date of the operation or production order. Resource Availability: The resource may not be available for the required time frame due to the calendar settings. Planning Horizon: The planning horizon may not include the time frame needed for the operation, leading to a mismatch between the operation's requirements and the resource's availability.
    Solution: Check Resource Calendar: Go to the resource master data in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker