Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 116
Message text: Resource &1: Calendar start is too late
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT116
- Resource &1: Calendar start is too late ?The SAP error message /SAPAPO/CDPSOPT116 Resource &1: Calendar start is too late typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the scheduling of resources. This error indicates that the start date of the calendar for the specified resource is set too late, which prevents the system from scheduling any activities or operations that require that resource.
Cause: Calendar Configuration: The calendar for the resource may not be set up correctly. It could be that the start date of the calendar is after the planned start date of the operation or production order. Resource Availability: The resource may not be available for the required time frame due to the calendar settings. Planning Horizon: The planning horizon may not include the time frame needed for the operation, leading to a mismatch between the operation's requirements and the resource's availability.
Solution: Check Resource Calendar: Go to the resource master data in
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT115
Resource &1: Calendar is not complete
What causes this issue? There are gaps in the resource &V1& calendar. The calendar has not been maintained up until the end of the optimizati...
/SAPAPO/CDPSOPT113
The newly created order &1 contains fixed activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT150
Maximum length of pegging relationship ignored between order &1 and &2
What causes this issue? Shelf life conditions or a maximum length have been defined at the pegging relationship between order &V1& and order ...
/SAPAPO/CDPSOPT151
Maximum interval of the internal order relationship in order &1 ignored
What causes this issue? Optimization could not find a solution that observed the maximum interval defined at the relationship within order &V1&am...
Click on this link to search all SAP messages.