How To Fix /SAPAPO/CDPSOPT112 - Scheduling has scheduled some activities differently


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 112

  • Message text: Scheduling has scheduled some activities differently

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT112 - Scheduling has scheduled some activities differently ?
    The SAP error message /SAPAPO/CDPSOPT112 indicates that the scheduling process in SAP Advanced Planning and Optimization (APO) has scheduled some activities differently than expected. This can occur in the context of production planning and scheduling, where the system may not align with the planned or desired scheduling due to various factors.
    Causes:
    
    Resource Constraints: The scheduling engine may have found that certain resources (machines, labor, etc.) are not available at the planned times, leading to a different scheduling outcome.
    Capacity Issues: If the capacity of resources is exceeded, the system may adjust the schedule to fit within the available capacity.
    Conflicting Activities: Overlapping activities or conflicting production orders can lead to a re-scheduling of activities.
    Changes in Demand: If there are changes in demand or order priorities, the scheduling may adjust to meet these new requirements.
    Scheduling Parameters: Incorrect or suboptimal scheduling parameters (like lead times, setup times, etc.) can lead to unexpected scheduling results.
    Master Data

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author