Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 112
Message text: Scheduling has scheduled some activities differently
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT112
- Scheduling has scheduled some activities differently ?The SAP error message
/SAPAPO/CDPSOPT112
indicates that the scheduling process in SAP Advanced Planning and Optimization (APO) has scheduled some activities differently than expected. This can occur in the context of production planning and scheduling, where the system may not align with the planned or desired scheduling due to various factors.Causes:
- Resource Constraints: The scheduling engine may have found that certain resources (machines, labor, etc.) are not available at the planned times, leading to a different scheduling outcome.
- Capacity Issues: If the capacity of resources is exceeded, the system may adjust the schedule to fit within the available capacity.
- Conflicting Activities: Overlapping activities or conflicting production orders can lead to a re-scheduling of activities.
- Changes in Demand: If there are changes in demand or order priorities, the scheduling may adjust to meet these new requirements.
- Scheduling Parameters: Incorrect or suboptimal scheduling parameters (like lead times, setup times, etc.) can lead to unexpected scheduling results.
- Master Data Issues: Problems with master data (like incorrect routing, BOM, or resource definitions) can also lead to discrepancies in scheduling.
Solutions:
- Review Scheduling Parameters: Check the scheduling parameters in the APO system to ensure they are set correctly. Adjust lead times, setup times, and other relevant parameters as necessary.
- Analyze Resource Availability: Ensure that the resources required for the scheduled activities are available. Check for any maintenance schedules or downtimes that may affect resource availability.
- Check Capacity Planning: Review the capacity planning settings to ensure that they align with the production requirements. Adjust capacity if necessary.
- Examine Conflicting Orders: Look for any conflicting production orders or activities that may be causing the scheduling engine to adjust the schedule. Resolve any conflicts.
- Review Master Data: Ensure that all relevant master data (BOMs, routings, resource definitions) is accurate and up to date.
- Run Scheduling Again: After making necessary adjustments, re-run the scheduling process to see if the issue persists.
Related Information:
/SAPAPO/CDPS
to access the detailed scheduling information and analyze the scheduling results.If the issue persists after trying the above solutions, it may be beneficial to consult with an SAP APO expert or reach out to SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT111
Scheduling could not adopt the solution
What causes this issue? Optimization could not transfer the solution to scheduling. Therefore, the planning situation has not changed since optimizat...
/SAPAPO/CDPSOPT110
No orders chosen that can be planned by optimization
What causes this issue? In the optimization horizon, there are either no orders or only orders that are <DS:TX.OPTIMIERUNG_FIXIERT>fixed for op...
/SAPAPO/CDPSOPT113
The newly created order &1 contains fixed activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...