Do you have any question about this error?
Message type: E = Error
Message class: SADA - CCMS: SAP DB Porting and Development
Message number: 039
Message text: The successor does not exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
SADA039
- The successor does not exist ?The SAP error message SADA039, which states "The successor does not exist," typically occurs in the context of project management or when dealing with network activities in SAP. This error indicates that the system is unable to find a successor activity that is supposed to follow a predecessor activity in a project or network.
Cause:
- Missing Successor Activity: The most common cause is that the successor activity has not been defined or created in the project or network.
- Incorrect Configuration: There may be an issue with how the activities are linked or configured, leading to the system not recognizing the successor.
- Data Inconsistency: There could be inconsistencies in the data, such as deleted or inactive activities that are still referenced.
- Project Structure Issues: The project structure may not be correctly set up, leading to missing links between activities.
Solution:
- Check Activity Definitions: Verify that the successor activity is defined in the project. If it does not exist, create it.
- Review Links: Check the predecessor-successor relationships in the project. Ensure that the links are correctly established and that the successor activity is properly assigned.
- Data Consistency Check: Run consistency checks on the project or network to identify any inconsistencies or errors in the data.
- Recreate Links: If the links are incorrect, you may need to delete and recreate them to ensure they are properly set up.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing project activities and resolving errors.
Related Information:
CJ20N
(Project Builder) or CN41
(Network Overview) to manage and review project activities.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional assistance.
Get instant SAP help. Start your 7-day free trial now.
SADA037
Only data from before &1 (more than &2 days old) can be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SADA036
Only data that is more than &1 days old can be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SADA040
Specify the backup type Log for the successor
What causes this issue? You need to specify the backup type Log (interactive log backup) for the succesor.System Response The system issues an error...
SADA041
No data is available from an earlier period
What causes this issue? No data is availble from an earlier period of time. This means that you cannot display a history.System Response The system ...