Do you have any question about this error?
Message type: E = Error
Message class: /S4PPM/CSP -
Message number: 001
Message text: Node name invalid.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/S4PPM/CSP001
- Node name invalid. ?The SAP error message
/S4PPM/CSP001 Node name invalid
typically occurs in the context of SAP S/4HANA Project and Portfolio Management (PPM) when there is an issue with the node name being referenced in a project or portfolio structure. This error can arise due to various reasons, such as incorrect configuration, missing data, or issues with the project hierarchy.Causes:
- Invalid Node Name: The node name being referenced does not exist in the system or is incorrectly specified.
- Configuration Issues: There may be issues with the configuration of the project structure or the hierarchy.
- Data Integrity Issues: Missing or inconsistent data in the project or portfolio management tables.
- Authorization Issues: The user may not have the necessary authorizations to access the specified node.
Solutions:
- Check Node Name: Verify that the node name you are trying to access is correct and exists in the system. You can do this by navigating to the relevant project or portfolio structure.
- Review Configuration: Ensure that the project structure is correctly configured. Check the settings in the Project Management or Portfolio Management configuration.
- Data Consistency Check: Run data consistency checks to identify any missing or inconsistent data in the project or portfolio management tables.
- Authorization Check: Ensure that the user has the necessary authorizations to access the node. You may need to consult with your SAP security team to verify this.
- Transaction Codes: Use relevant transaction codes (like
CJ20N
for project management) to navigate to the project and check the structure.- SAP Notes: Check for any relevant SAP Notes that may address this specific error. SAP frequently releases notes that provide fixes or workarounds for known issues.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/S4PPM/CRUD164
Milestones(&1) name must not exceed 40 characters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/S4PPM/CRUD163
Profit Center and Functional Area inherited from the billing work package
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/S4PPM/CSP002
Association name invalid.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/S4PPM/CSP003
Duplicate key exists. The entry could not be inserted.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.