Message type: E = Error
Message class: RSH_LVLING_CONFLICTS - Leveling Conflicts (Business Messages)
Message number: 103
Message text: ThereÆs nothing to be scheduled
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RSH_LVLING_CONFLICTS103
- ThereÆs nothing to be scheduled ?The SAP error message RSH_LVLING_CONFLICTS103 with the description "There’s nothing to be scheduled" typically occurs in the context of SAP's production planning and scheduling processes, particularly when using the SAP Advanced Planning and Optimization (APO) module or similar functionalities.
Cause:
This error message usually indicates that the system has not found any valid activities or tasks that can be scheduled based on the current planning data. The reasons for this can include:
- No Available Resources: There may be no resources (machines, labor, etc.) available for scheduling.
- Incorrect Planning Data: The planning data might be incomplete or incorrect, leading to no valid scheduling options.
- Conflicting Constraints: There may be constraints or conflicts in the scheduling parameters that prevent any activities from being scheduled.
- Time Frame Issues: The time frame for scheduling might be set incorrectly, leading to no activities being available for the specified period.
- Missing Master Data: Essential master data (like production versions, work centers, etc.) might be missing or not properly configured.
Solution:
To resolve the error, you can take the following steps:
- Check Resource Availability: Ensure that the resources required for scheduling are available and not blocked or overloaded.
- Review Planning Data: Verify that all necessary planning data is complete and accurate. This includes checking production orders, planned orders, and any relevant master data.
- Examine Constraints: Look for any constraints or conflicts in the scheduling parameters that might be preventing scheduling. This could include capacity constraints, lead times, or other scheduling rules.
- Adjust Time Frame: Make sure that the time frame for scheduling is set correctly. If you are trying to schedule in the past or outside of the planned horizon, adjust the dates accordingly.
- Check Master Data: Ensure that all relevant master data is correctly set up and available. This includes checking work centers, production versions, and any other related data.
- Run Planning Functions: If applicable, run the planning functions again to see if the issue persists after making adjustments.
Related Information:
MD04
(Stock/Requirements List) or COHV
(Mass Processing of Production Orders).If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and scheduling.
Get instant SAP help. Start your 7-day free trial now.
RSH_LVLING_CONFLICTS100
Operations were scheduled without conflicts
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RSH_LEVELING035
The schedule is no longer accessible.
What causes this issue? You can no longer access the schedule. This happens if the schedule was deleted by another planner or if someone removed you ...
RSH_LVLING_CONFLICTS300
Cannot keep the relationship between Operation &1 and Operation &2
What causes this issue? Operation &V1& has a relationship to Operation &V2&. Depending on whether it is a finish-start (FS) or a star...
RSH_LVLING_CONFLICTS301
Make sure to schedule Operation &1 before Operation &2.
What causes this issue? A finish-start relationship exists between both operations. However, the predecessor operation has not yet been scheduled.Sys...