How To Fix RSH_LVLING_CONFLICTS100 - Operations were scheduled without conflicts


RSH_LVLING_CONFLICTS100 - Overview

  • Message type: E = Error

  • Message class: RSH_LVLING_CONFLICTS - Leveling Conflicts (Business Messages)

  • Message number: 100

  • Message text: Operations were scheduled without conflicts

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSH_LVLING_CONFLICTS100 - Operations were scheduled without conflicts ?
    The SAP error message RSH_LVLING_CONFLICTS100 indicates that there are conflicts in the scheduling of operations in a production order or project. This error typically arises when the system detects that certain operations cannot be scheduled simultaneously due to resource constraints, dependencies, or other scheduling rules.
    
    Cause: Resource Conflicts: The operations may require the same resources (machines, tools, or labor) that are not available at the same time. Dependency Issues: There may be dependencies between operations that prevent them from being scheduled concurrently. Capacity Constraints: The available capacity of resources may not be sufficient to handle the scheduled operations. Incorrect Scheduling Parameters: The settings in the scheduling parameters may not allow for the operations to be scheduled as intended.
    Solution: Review Resource Allocation: Check the resource assignments for the operations in question. Ensure that resources are not over-allocated and that they can handle the required workload. Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the production order

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker