How To Fix RSBPCB_EXCEPTION118 - BPF: Instance &1, could not schedule activity deadline


RSBPCB_EXCEPTION118 - Overview

  • Message type: E = Error

  • Message class: RSBPCB_EXCEPTION - BPC: BPF Message Class

  • Message number: 118

  • Message text: BPF: Instance &1, could not schedule activity deadline

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSBPCB_EXCEPTION118 - BPF: Instance &1, could not schedule activity deadline ?
    The SAP error message RSBPCB_EXCEPTION118 typically occurs in the context of Business Planning and Consolidation (BPC) when there is an issue with scheduling an activity deadline for a specific instance. This error can arise due to various reasons, and understanding the cause is crucial for finding an appropriate solution.
    Possible Causes:
    
    
    Configuration Issues: There may be misconfigurations in the BPC settings or in the planning model that prevent the scheduling of activities. Resource Constraints: The system may not have enough resources (e.g., memory, processing power) to schedule the activity. Locking Issues: Another process might be locking the instance or the activity, preventing it from being scheduled. Incorrect Parameters: The parameters set for the activity might be incorrect or incomplete, leading to scheduling failures. System Errors: There could be underlying system errors or bugs that are causing the scheduling to fail. Solutions: Check Configuration: Review the BPC configuration settings to ensure that everything is set up correctly. Pay special

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker