Do you have any question about this error?
Message type: E = Error
Message class: RQ - Messages for Cash Management and Forecast
Message number: 207
Message text: You can only enter one leveling period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RQ207
- You can only enter one leveling period ?The SAP error message RQ207, "You can only enter one leveling period," typically occurs in the context of production planning and control, particularly when dealing with capacity leveling in SAP. This error indicates that the system expects only one leveling period to be defined for a specific operation or planning scenario, but multiple periods have been entered or defined.
Cause:
- Multiple Leveling Periods Defined: The most common cause of this error is that the user has inadvertently entered more than one leveling period in the relevant configuration or transaction.
- Incorrect Configuration: The settings in the planning parameters or the specific transaction may not align with the expected input for leveling periods.
- Data Entry Error: Users may mistakenly input data in a way that the system interprets as multiple periods.
Solution:
- Check Leveling Periods: Review the input fields where leveling periods are defined. Ensure that only one leveling period is specified. This can usually be done in the transaction where the error occurred.
- Review Configuration Settings: If you are working with specific planning parameters, check the configuration settings in the relevant customizing transaction (e.g., SPRO) to ensure that they are set up correctly for your planning scenario.
- Consult Documentation: Refer to SAP documentation or help files related to the specific transaction or module you are working with to understand the expected input format and requirements.
- User Training: If this error is recurring, consider providing additional training for users on how to correctly enter data in the relevant transactions to avoid similar issues in the future.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
RQ206
G/L account & does not record open items
What causes this issue? The G/L account does not record open itemsSystem Response The system issues an error message and will not allow you to conti...
RQ205
Account & does not exist in company code &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RQ208
The leveling period must not be before the reorganization date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RQ209
Program takes a long time to run. Schedule it as a batch job
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.