How To Fix RPM_INTEGRATION321 - xPD concept &1 synchronized with Portf. Mgmt Project &2


RPM_INTEGRATION321 - Overview

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 321

  • Message text: xPD concept &1 synchronized with Portf. Mgmt Project &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION321 - xPD concept &1 synchronized with Portf. Mgmt Project &2 ?
    The SAP error message RPM_INTEGRATION321 typically relates to issues with the integration between the SAP Portfolio and Project Management (PPM) module and the SAP Resource and Portfolio Management (RPM) module. This error indicates that there is a synchronization issue between an xPD concept and a Portfolio Management project.
    
    Cause: Data Mismatch: The error can occur if there is a mismatch in the data between the xPD concept and the corresponding Portfolio Management project. This could be due to changes made in one system that have not been reflected in the other.
    Configuration Issues: Incorrect configuration settings in either the RPM or PPM modules can lead to synchronization problems. Missing or Incomplete Data: If required fields or data are missing in either the xPD concept or the Portfolio Management project, it can cause synchronization errors. System Integration Issues: Problems with the integration setup between the two modules can also lead to this error.
    Solution: Check Data Consistency: Verify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker