How To Fix RPM_INTEGRATION321 - xPD concept &1 synchronized with Portf. Mgmt Project &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 321

  • Message text: xPD concept &1 synchronized with Portf. Mgmt Project &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION321 - xPD concept &1 synchronized with Portf. Mgmt Project &2 ?

    The SAP error message RPM_INTEGRATION321 typically relates to issues with the integration between the SAP Portfolio and Project Management (PPM) module and the SAP Resource and Portfolio Management (RPM) module. This error indicates that there is a synchronization issue between an xPD concept and a Portfolio Management project.

    Cause:

    1. Data Mismatch: The error can occur if there is a mismatch in the data between the xPD concept and the corresponding Portfolio Management project. This could be due to changes made in one system that have not been reflected in the other.
    2. Configuration Issues: Incorrect configuration settings in either the RPM or PPM modules can lead to synchronization problems.
    3. Missing or Incomplete Data: If required fields or data are missing in either the xPD concept or the Portfolio Management project, it can cause synchronization errors.
    4. System Integration Issues: Problems with the integration setup between the two modules can also lead to this error.

    Solution:

    1. Check Data Consistency: Verify that the data in the xPD concept matches the data in the Portfolio Management project. Look for discrepancies in key fields.
    2. Review Configuration Settings: Ensure that the configuration settings for both the RPM and PPM modules are correctly set up. This includes checking integration settings and ensuring that all necessary components are activated.
    3. Update Missing Data: If any required data is missing, update the xPD concept or the Portfolio Management project to include the necessary information.
    4. Re-synchronize: If the issue persists, you may need to re-synchronize the xPD concept with the Portfolio Management project. This can often be done through the relevant transaction codes or integration tools within SAP.
    5. Consult Documentation: Refer to SAP documentation or notes related to RPM and PPM integration for any specific guidelines or troubleshooting steps.
    6. Contact SAP Support: If the issue cannot be resolved internally, consider reaching out to SAP support for assistance, providing them with the error message and any relevant details.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes for managing projects and resources in SAP, such as CJ20N (Project Builder) and RPM-related transactions.
    • SAP Notes: Check for any SAP Notes that may address known issues or provide patches related to this error message.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the root cause of the RPM_INTEGRATION321 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author