How To Fix RPM_INTEGRATION319 - Project synchronization started at &1 &2 in Portf. Mgmt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 319

  • Message text: Project synchronization started at &1 &2 in Portf. Mgmt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION319 - Project synchronization started at &1 &2 in Portf. Mgmt ?

    The SAP error message RPM_INTEGRATION319 typically indicates an issue related to project synchronization in the Portfolio Management module. This message is often associated with the integration between project management and portfolio management components in SAP.

    Cause:

    The error message "RPM_INTEGRATION319 Project synchronization started at &1 &2" usually arises due to one of the following reasons:

    1. Data Inconsistencies: There may be inconsistencies in the project data that prevent successful synchronization.
    2. Configuration Issues: Incorrect configuration settings in the integration between project management and portfolio management can lead to synchronization failures.
    3. Locking Issues: If the project or related objects are locked by another process, it may prevent synchronization from completing.
    4. Missing Authorizations: The user attempting the synchronization may lack the necessary authorizations to perform the operation.
    5. Technical Errors: There could be underlying technical issues, such as database connectivity problems or system performance issues.

    Solution:

    To resolve the RPM_INTEGRATION319 error, you can take the following steps:

    1. Check Data Consistency:

      • Review the project data for any inconsistencies or missing information that could affect synchronization.
      • Use transaction codes like CJ20N (Project Builder) to check the project structure and data.
    2. Review Configuration Settings:

      • Ensure that the integration settings between project management and portfolio management are correctly configured.
      • Check the settings in transaction SPRO under the relevant configuration paths.
    3. Check for Locks:

      • Use transaction SM12 to check for any locks on the project or related objects. If locks are found, determine the cause and resolve them.
    4. Verify Authorizations:

      • Ensure that the user has the necessary authorizations to perform project synchronization. Check roles and authorizations in transaction PFCG.
    5. Monitor System Performance:

      • Check system performance and logs for any technical issues that may be affecting synchronization. Use transaction SM21 to view system logs.
    6. Re-attempt Synchronization:

      • After addressing the above issues, re-attempt the synchronization process. You can do this through the relevant transaction or program.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address known issues related to this error message. You can search for notes in the SAP Support Portal.
    • Documentation: Review the official SAP documentation for Portfolio Management and Project Management for best practices and troubleshooting tips.
    • Community Forums: Engage with SAP community forums or user groups for additional insights and solutions from other users who may have encountered similar issues.

    If the problem persists after following these steps, consider reaching out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant