How To Fix RPM_INTEGRATION254 - Microsoft Project not defined as lead system; cannot create resource/role


RPM_INTEGRATION254 - Overview

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 254

  • Message text: Microsoft Project not defined as lead system; cannot create resource/role

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


RPM_INTEGRATION254 - Details

  • The SAP error message RPM_INTEGRATION254 indicates that Microsoft Project is not defined as the lead system in the integration settings of SAP. This error typically occurs when there is an attempt to create a resource or role in SAP from Microsoft Project, but the integration configuration does not recognize Microsoft Project as the primary system for resource management.
    
    Cause: Integration Configuration: The integration between SAP and Microsoft Project is not properly configured. Specifically, Microsoft Project is not set as the lead system for resource and role management. Missing Settings: The necessary settings in the SAP Project Management (PS) module or the integration settings may be missing or incorrectly configured. User Permissions: The user attempting to perform the action may not have the necessary permissions to create resources or roles.
    Solution: To resolve this error, you can follow these steps: Check Integration Settings: Go to the SAP system and check the integration settings for Microsoft Project. Ensure that Microsoft Project

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


RPM_INTEGRATION254 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker