How To Fix RPM_INTEGRATION215 - No changes between &1 &2 in base project system and &3 &4 in Portf. Mgmt


RPM_INTEGRATION215 - Overview

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 215

  • Message text: No changes between &1 &2 in base project system and &3 &4 in Portf. Mgmt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION215 - No changes between &1 &2 in base project system and &3 &4 in Portf. Mgmt ?
    The SAP error message RPM_INTEGRATION215 indicates that there are no changes detected between the specified base project system and the portfolio management system. This error typically arises in the context of project management and integration between different SAP modules, particularly when synchronizing data between the Project System (PS) and Portfolio Management (PM).
    
    Cause: No Changes Made: The most straightforward cause is that there have been no changes made to the project in the base project system that would require synchronization with the portfolio management system. Data Synchronization Issues: There may be issues with the data synchronization process, where changes in one system are not being reflected in the other.
    Configuration Issues: Incorrect configuration settings in either the Project System or Portfolio Management could lead to this error. Timing Issues: If the synchronization process is run too frequently or at the wrong time, it may not detect any changes.
    Solution: Verify Changes: Check if there have been any

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker