How To Fix RPM_INTEGRATION214 - &1 &2 changed in base proj. system; &3 &4 will be updated in Portf. Mgmt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 214

  • Message text: &1 &2 changed in base proj. system; &3 &4 will be updated in Portf. Mgmt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION214 - &1 &2 changed in base proj. system; &3 &4 will be updated in Portf. Mgmt ?

    The SAP error message RPM_INTEGRATION214 typically relates to issues in the integration between the Project System (PS) and Portfolio Management (PM) modules. This error indicates that there has been a change in the base project system, and as a result, certain elements will be updated in Portfolio Management.

    Cause:

    1. Data Synchronization Issues: The error often arises when there are discrepancies between the data in the Project System and the Portfolio Management system. This can happen if changes are made in the project data (like project definitions, WBS elements, etc.) without corresponding updates in the Portfolio Management module.

    2. Inconsistent Data: If the project data has been modified (e.g., changes in project attributes, status, or structure) and these changes have not been reflected in the Portfolio Management, the system raises this error to alert users of the inconsistency.

    3. Integration Configuration: There may be issues with the configuration settings for the integration between the Project System and Portfolio Management, leading to improper data flow.

    Solution:

    1. Check Project Changes: Review the changes made in the Project System. Ensure that all necessary updates are reflected in the Portfolio Management module. This may involve manually updating or synchronizing the data.

    2. Data Consistency Check: Perform a consistency check between the Project System and Portfolio Management. Use transaction codes like CJ20N (Project Builder) or CVI (for integration checks) to identify discrepancies.

    3. Reprocess Integration: If the changes are valid and should be reflected in Portfolio Management, you may need to reprocess the integration. This can often be done through specific transaction codes or background jobs that handle data synchronization.

    4. Review Configuration: Check the configuration settings for the integration between the Project System and Portfolio Management. Ensure that all necessary settings are correctly configured to allow for seamless data flow.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or patches that may address the issue.

    6. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance. They may provide specific notes or patches that address the error.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N, CJ02, and CVI for project management and integration checks.
    • SAP Notes: Search for SAP Notes related to RPM_INTEGRATION214 for any known issues or fixes.
    • Integration Settings: Review the integration settings in the IMG (Implementation Guide) under Project System and Portfolio Management to ensure they are correctly set up.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant