How To Fix RPM_INTEGRATION213 - &1 &2 deleted in base proj. system; &3 &4 will be deleted in Portf. Mgmt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 213

  • Message text: &1 &2 deleted in base proj. system; &3 &4 will be deleted in Portf. Mgmt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION213 - &1 &2 deleted in base proj. system; &3 &4 will be deleted in Portf. Mgmt ?

    The SAP error message RPM_INTEGRATION213 typically indicates an issue related to the integration between the Project System (PS) and Portfolio Management (PM) modules. This error occurs when a project or project-related object is deleted in the base project system, and the system is notifying you that corresponding entries in Portfolio Management will also be deleted.

    Cause:

    1. Deletion of Project/Objects: The primary cause of this error is the deletion of a project or project-related object in the base project system (PS). This could be due to manual deletion, data cleanup, or changes in project structure.
    2. Integration Issues: There may be issues with the integration settings between the Project System and Portfolio Management, leading to inconsistencies in data.
    3. Data Consistency: The system is enforcing data consistency between the two modules, and when an object is deleted in one, it must also be deleted in the other.

    Solution:

    1. Check Deletion: Verify if the project or object mentioned in the error message has indeed been deleted in the base project system. If it was deleted intentionally, you may need to confirm that this is the desired action.
    2. Review Integration Settings: Check the integration settings between Project System and Portfolio Management to ensure they are correctly configured. This may involve reviewing customizing settings in SAP.
    3. Data Consistency Check: Run consistency checks in both the Project System and Portfolio Management to identify any discrepancies or issues that need to be resolved.
    4. Recreate or Restore: If the deletion was not intended, consider restoring the deleted project or object if possible. If it was a mistake, you may need to recreate the project or object.
    5. Consult Documentation: Refer to SAP documentation or notes related to RPM_INTEGRATION213 for any specific guidance or patches that may address this issue.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like CJ20N (Project Builder) to check project details or CVI (Customer-Vendor Integration) for integration settings.
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message. You can search for the error message number in the SAP Support Portal.
    • Support: If the issue persists, consider reaching out to SAP support or your internal SAP support team for further assistance.

    By following these steps, you should be able to address the RPM_INTEGRATION213 error and ensure proper integration between the Project System and Portfolio Management modules.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant