How To Fix RPM_CAPACITY_MGR032 - Hours per day is initial, conversion rate from & to & set to zero


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_CAPACITY_MGR - Message Class for Capacity Management

  • Message number: 032

  • Message text: Hours per day is initial, conversion rate from & to & set to zero

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_CAPACITY_MGR032 - Hours per day is initial, conversion rate from & to & set to zero ?

    The SAP error message RPM_CAPACITY_MGR032 indicates that there is an issue with the configuration of capacity planning in the SAP system, specifically related to the hours per day setting and the conversion rate between units of measure. Here’s a breakdown of the cause, potential solutions, and related information:

    Cause:

    1. Initial Hours per Day: The error suggests that the "Hours per day" parameter is set to an initial value (likely blank or zero). This parameter is crucial for capacity planning as it defines how many hours are available for work in a day.

    2. Conversion Rate Set to Zero: The conversion rate from one unit of measure to another is set to zero, which means that the system cannot convert between these units, leading to inconsistencies in capacity calculations.

    Solution:

    1. Check and Set Hours per Day:

      • Navigate to the relevant configuration settings in SAP (usually found in the customizing settings under the capacity planning area).
      • Ensure that the "Hours per day" parameter is set to a valid number (e.g., 8 hours for a standard workday).
    2. Review Conversion Rates:

      • Go to the unit of measure settings in SAP.
      • Check the conversion rates between the relevant units of measure. Ensure that they are set correctly and that none of them are set to zero.
      • If necessary, update the conversion rates to reflect the correct values.
    3. Validate Configuration:

      • After making changes, validate the configuration by running a test scenario to ensure that the error does not reoccur.
      • Check if there are any other related settings that might need adjustment.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on capacity planning and unit of measure settings.
    5. Contact SAP Support:

      • If the issue persists after making the necessary adjustments, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like SPRO (to access the SAP Reference IMG) to navigate to the relevant configuration areas.
    • Capacity Planning: Understanding the basics of capacity planning in SAP can help in troubleshooting similar issues in the future.
    • Unit of Measure Configuration: Familiarize yourself with how units of measure are defined and managed in SAP, as this is critical for accurate capacity calculations.

    By addressing the configuration of hours per day and conversion rates, you should be able to resolve the RPM_CAPACITY_MGR032 error.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant