How To Fix RPM_CAPACITY_MGR030 - Incomplete calendar/location/hours per day data for resource &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_CAPACITY_MGR - Message Class for Capacity Management

  • Message number: 030

  • Message text: Incomplete calendar/location/hours per day data for resource &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_CAPACITY_MGR030 - Incomplete calendar/location/hours per day data for resource & ?

    The SAP error message RPM_CAPACITY_MGR030 indicates that there is incomplete data related to the calendar, location, or hours per day for a specific resource in the Resource Planning Management (RPM) module. This error typically arises when the system is unable to find the necessary information to calculate the capacity or availability of a resource.

    Cause:

    1. Incomplete Calendar Data: The calendar assigned to the resource may not have been fully defined, or there may be missing entries for working days, holidays, or shifts.
    2. Missing Location Data: The resource may not be linked to a valid location, or the location may not have the necessary configuration.
    3. Hours Per Day Not Defined: The resource may not have defined working hours per day, which are essential for capacity planning.
    4. Resource Configuration Issues: The resource itself may not be properly configured in the system, leading to missing or incomplete data.

    Solution:

    1. Check Calendar Configuration:

      • Go to the calendar settings in SAP and ensure that the calendar assigned to the resource is complete and correctly configured.
      • Verify that all working days, holidays, and shifts are defined.
    2. Verify Location Assignment:

      • Ensure that the resource is correctly assigned to a valid location.
      • Check the location settings to confirm that they are properly configured.
    3. Define Working Hours:

      • Make sure that the hours per day for the resource are defined in the system.
      • You can do this by navigating to the resource's configuration and checking the working time settings.
    4. Review Resource Configuration:

      • Check the overall configuration of the resource in the system to ensure that all necessary fields are filled out correctly.
      • If needed, reconfigure the resource to ensure all required data is present.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on configuring calendars, locations, and resources.
    6. Testing:

      • After making the necessary changes, test the resource planning functionality to ensure that the error no longer occurs.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CR01 (Create Resource), CR02 (Change Resource), or CR03 (Display Resource) to manage resource configurations.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Roles: Ensure that you have the necessary permissions to make changes to resource configurations and calendars.

    By following these steps, you should be able to resolve the RPM_CAPACITY_MGR030 error and ensure that your resource data is complete and accurate for capacity planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author