How To Fix /RPM/ITEM018 - For item &1 planned start &2 is later than planned finish &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /RPM/ITEM -

  • Message number: 018

  • Message text: For item &1 planned start &2 is later than planned finish &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /RPM/ITEM018 - For item &1 planned start &2 is later than planned finish &3 ?

    The SAP error message /RPM/ITEM018 indicates that there is a discrepancy in the planning dates for a specific item in the Resource and Project Management (RPM) module. Specifically, the error states that the planned start date for an item is later than its planned finish date, which is logically inconsistent.

    Cause:

    The error occurs due to one of the following reasons:

    1. Incorrect Date Entry: The planned start date (&2) has been entered incorrectly and is set to a date that is after the planned finish date (&3).
    2. Data Migration Issues: If data has been migrated from another system, there may have been errors in the date fields.
    3. Manual Adjustments: Changes made manually to the planned dates without proper validation can lead to this inconsistency.
    4. System Bugs: In rare cases, there may be bugs in the system that cause this error to appear.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check the Dates:

      • Navigate to the item in question and review the planned start and finish dates.
      • Ensure that the planned start date is earlier than the planned finish date.
    2. Correct the Dates:

      • If the planned start date is indeed later than the planned finish date, update the planned start date to a date that is earlier than the planned finish date.
    3. Validate Changes:

      • After making the changes, validate the item to ensure that the error message no longer appears.
    4. Review Related Items:

      • If the item is part of a larger project or has dependencies, check related items to ensure that their dates are also consistent.
    5. Consult Documentation:

      • If you are unsure about the correct dates, consult project documentation or stakeholders to confirm the intended schedule.
    6. System Check:

      • If the issue persists after correcting the dates, consider checking for any system updates or patches that may address known bugs.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to access and modify project items.
    • User Authorization: Ensure that you have the necessary permissions to make changes to project planning data.
    • SAP Notes: Check the SAP Support Portal for any relevant notes or updates related to this error message.
    • Testing: After making changes, it is advisable to test the project planning functionality to ensure that the error does not reoccur.

    By following these steps, you should be able to resolve the /RPM/ITEM018 error and ensure that your project planning data is consistent and accurate.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant