Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: RMXTSTABI - Messages for Stability Study in TMS
Message number: 015
Message text: No trial is assigned; information mail cannot be sent to project manager
You have not entered a reference trial for the study, which means that
the system cannot determine a project manager. No information mail
was sent.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If necessary, send a mail to each person or group concerned.
Error message extract from SAP system. Copyright SAP SE.
RMXTSTABI015
- No trial is assigned; information mail cannot be sent to project manager ?The SAP error message RMXTSTABI015 indicates that there is no trial assigned to a project, which prevents the system from sending an information email to the project manager. This error typically arises in the context of project management or project system modules within SAP.
Cause:
- No Trial Assigned: The primary cause of this error is that the project in question does not have a trial (or test) assigned to it. Trials are often used in project management to simulate or test various scenarios before actual execution.
- Configuration Issues: There may be configuration issues in the project management settings that prevent the assignment of a trial.
- Missing Data: Required data or settings related to the project or the project manager may be missing or incorrectly configured.
Solution:
Assign a Trial:
- Navigate to the project in question within the SAP system.
- Check the project details and ensure that a trial is assigned. If not, assign an appropriate trial to the project.
Check Project Configuration:
- Review the project configuration settings to ensure that all necessary parameters are set correctly.
- Ensure that the project manager's email address is correctly configured in the system.
Review User Roles and Authorizations:
- Ensure that the user attempting to send the email has the necessary authorizations to perform this action.
- Check if the project manager has the correct role assigned to receive notifications.
Consult Documentation:
- Refer to SAP documentation or help resources for specific instructions on how to assign trials and configure project settings.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to manage project details.By following these steps, you should be able to resolve the RMXTSTABI015 error and ensure that the project manager receives the necessary information emails.
Get instant SAP help. Sign up for our Free Essentials Plan.
RMXTSTABI014
Building block &1: Planning ID is missing for storage condition &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTSTABI013
Building block &1 does not contain a scheduling strategy
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTSTABI016
No e-mail address is known; information mail was not sent
What causes this issue? The system could not determine an e-mail address and since no address was specified manually, no information mail could be se...
RMXTSTABI017
Building block &1: Quantity and UoM are required for storage condition &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.