Do you have any question about this error?
Message type: E = Error
Message class: RMXTSTABI - Messages for Stability Study in TMS
Message number: 013
Message text: Building block &1 does not contain a scheduling strategy
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RMXTSTABI013
- Building block &1 does not contain a scheduling strategy ?The SAP error message RMXTSTABI013 indicates that a specific building block (identified by &1) does not contain a scheduling strategy. This error typically arises in the context of SAP Advanced Planning and Optimization (APO) or similar modules where scheduling strategies are essential for planning and execution processes.
Cause:
- Missing Scheduling Strategy: The building block referenced in the error message has not been assigned a scheduling strategy. This could be due to configuration oversight or incomplete setup.
- Incorrect Configuration: The building block may not have been properly configured in the system, leading to the absence of a scheduling strategy.
- Data Inconsistency: There may be inconsistencies in the master data or configuration settings that prevent the system from recognizing the scheduling strategy.
Solution:
Assign a Scheduling Strategy:
- Navigate to the configuration settings for the building block in question.
- Ensure that a valid scheduling strategy is assigned to the building block. This can typically be done in the SAP APO or relevant module configuration settings.
- If you are unsure which scheduling strategy to use, consult your organization's planning guidelines or documentation.
Check Configuration:
- Review the configuration of the building block to ensure that all necessary parameters are set correctly.
- Verify that the building block is correctly linked to the relevant planning area and that all required settings are in place.
Data Consistency Check:
- Perform a consistency check on the master data related to the building block. Ensure that all necessary data is complete and accurate.
- If there are discrepancies, correct them in the master data settings.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on scheduling strategies and building block configurations.
- If needed, consult with your SAP support team or a functional consultant for assistance.
Related Information:
/SAPAPO/SDP1
for planning area settings or /SAPAPO/MC62
for checking and maintaining master data.By following these steps, you should be able to resolve the RMXTSTABI013 error and ensure that the building block has the necessary scheduling strategy assigned.
Get instant SAP help. Start your 7-day free trial now.
RMXTSTABI012
Study does not contain a building block
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTSTABI011
Building block &1: Quantity and UoM are required for initial sample
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTSTABI014
Building block &1: Planning ID is missing for storage condition &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTSTABI015
No trial is assigned; information mail cannot be sent to project manager
What causes this issue? You have not entered a reference trial for the study, which means that the system cannot determine a project manager. No info...
Click on this link to search all SAP messages.