Do you have any question about this error?
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 794
Message text: Switched to "Propose all operations"
You are carrying out an activity backflush and have deactivated the
reporting point backflush. In this case, the system automatically
proposes target activities for all the operations of the routing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you only want the system to propose target activities for the
operations at a particular reporting point or after the last reporting
point, reactivate the reporting point backflush.
Error message extract from SAP system. Copyright SAP SE.
RM794
- Switched to "Propose all operations" ?The SAP error message RM794, which states "Switched to 'Propose all operations'," typically occurs in the context of production planning and scheduling within the SAP system. This message indicates that the system has switched to a mode where it proposes all operations for a production order or process, rather than just the operations that were initially planned or scheduled.
Cause:
The error can be triggered by several factors, including:
- Missing or Incomplete Data: If the system cannot find the necessary data to schedule specific operations, it may default to proposing all operations.
- Configuration Issues: Incorrect settings in the production planning configuration can lead to this message being displayed.
- Capacity Constraints: If there are capacity constraints that prevent the scheduling of specific operations, the system may revert to proposing all operations.
- Order Status: The status of the production order may not allow for specific operations to be scheduled, leading to this fallback.
Solution:
To resolve the RM794 error, consider the following steps:
- Check Data Completeness: Ensure that all necessary data for the production order is complete and accurate. This includes material availability, routing, and work center data.
- Review Configuration Settings: Verify the configuration settings in the production planning module. Ensure that the settings for scheduling and operation proposals are correctly defined.
- Analyze Capacity Planning: Check the capacity of work centers involved in the production order. If there are capacity issues, consider adjusting the capacity or rescheduling the operations.
- Examine Order Status: Review the status of the production order to ensure it is in a state that allows for the scheduling of specific operations.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the RM794 message and its implications in your version of SAP.
Related Information:
By following these steps, you should be able to diagnose and resolve the RM794 error in your SAP system. If the issue persists, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RM793
Switched to "Propose all components"
What causes this issue? You are carrying out a component backflush and you deactivated the reporting point backflush. In this case, the system automa...
RM792
Confirmation type reset to assembly confirmation
What causes this issue? You were in the make-to-stock scenario with backflush type component or activity backflush and switched to another scenario u...
RM795
Sales order copied from the planned order
What causes this issue? You entered a sales order and a planned order. The sales order in the planned order does not correspond to the sales order yo...
RM796
Cancelled by user
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.