How To Fix RM793 - Switched to "Propose all components"


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RM - Messages for Repetitive Manufacturing

  • Message number: 793

  • Message text: Switched to "Propose all components"

  • Show details Hide details
  • What causes this issue?

    You are carrying out a component backflush and you deactivated the
    reporting point backflush. In this case, the system automatically
    proposes all the compoments of the BOM.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    If you only want the system to propose the components for one reporting
    point or the components after the last reporting point, you should
    reactivate the reporting point backflush.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RM793 - Switched to "Propose all components" ?

    The SAP error message RM793, which states "Switched to 'Propose all components'," typically occurs in the context of production planning or material requirements planning (MRP) when the system is unable to determine a specific component for a production order or a planned order. This can happen for various reasons, such as missing data, incorrect settings, or issues with the bill of materials (BOM).

    Causes:

    1. Missing Components: The system cannot find the required components in the BOM for the material being produced.
    2. Incorrect BOM: The BOM may not be correctly configured, or the components may not be valid for the production order.
    3. Material Master Issues: The material master data may be incomplete or incorrect, leading to issues in component determination.
    4. MRP Settings: The MRP settings may not be configured correctly, affecting how components are proposed.
    5. Availability Check: The availability check for components may not be set up properly, causing the system to default to proposing all components.

    Solutions:

    1. Check BOM: Verify that the BOM for the material is correctly defined and that all required components are listed.
    2. Review Material Master: Ensure that the material master data for the components is complete and accurate.
    3. MRP Configuration: Review the MRP settings in the system to ensure they are configured correctly for the production process.
    4. Availability Check: Check the availability check settings to ensure they are set up to allow for proper component determination.
    5. Run MRP Again: After making any necessary changes, run the MRP process again to see if the issue is resolved.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CS03 (Display BOM), MM03 (Display Material), or MD02 (MRP Run) to investigate and resolve the issue.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on BOM management, MRP processes, and material master data management.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and MRP processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker