Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 340
Message text: Not possible to change the reporting point structure for the date entered
You are trying to change the reporting point structure for the run
schedule header outwith the posting period. Changes to the reporting
point structure are only possible within the current and the previous
period.
The system cannot carry out the changes to the reporting point
structure.
Select a change date within the current or previous period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RM340
- Not possible to change the reporting point structure for the date entered ?The SAP error message RM340, which states "Not possible to change the reporting point structure for the date entered," typically occurs in the context of reporting point structures in SAP, particularly in the area of logistics or production planning. This error indicates that there is an attempt to modify the reporting point structure for a date that is not valid or permissible based on the system's configuration or data integrity rules. Causes: Date Restrictions: The date you are trying to change may be outside the allowed range for modifications. For example, if the reporting point structure is locked for certain periods (like closed fiscal periods), changes cannot be made.
Configuration Issues: The reporting point structure may not be configured correctly in the system, or there may be inconsistencies in the data. Authorization Issues: The user may not have the necessary permissions to make changes to the reporting point structure for the specified date. Data Integrity:
Get instant SAP help. Sign up for our Free Essentials Plan.
RM339
Routing not found
What causes this issue? The system cannot find a suitable routing for building or changing the reporting point structure for the run schedule header....
RM338
Inconsistencies between production version and run schedule header
What causes this issue? There are data in the run schedule header which do not correspond to the production version, for example, routing or BOM data...
RM341
Date entered is invalid
What causes this issue? The system cannot interpret the date entered.System Response The system issues an error message and will not allow you to co...
RM342
Reporting point data not found
What causes this issue? When reading the reporting point data for the run schedule header, an inconsistency occurred in the database.System Response ...
Click on this link to search all SAP messages.