Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 024
Message text: Confirmation for prodn lot only poss. in case of nonvaluated proj. stock
In repetitive manufacturing, backflushing to a production lot is only
possible for nonvaluated project stock. The planned order found for the
production lot, however, is for valuated project stock.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RM024
- Confirmation for prodn lot only poss. in case of nonvaluated proj. stock ?The SAP error message RM024 ("Confirmation for production lot only possible in case of non-valuated project stock") typically occurs in the context of production confirmations in SAP when dealing with project stock. This error indicates that the system is expecting a non-valuated project stock for the production lot confirmation, but the current configuration or stock type does not meet this requirement.
Cause:
- Stock Type: The error usually arises when you are trying to confirm production for a lot that is associated with valuated project stock, which is not allowed. Non-valuated project stock is required for certain types of confirmations.
- Configuration Issues: The configuration settings in the project system or material management module may not be set up correctly to handle the stock types involved.
- Material Master Settings: The material master record may not be configured to allow for non-valuated project stock.
Solution:
- Check Stock Type: Ensure that the stock you are trying to confirm is indeed non-valuated project stock. You can check this in the stock overview or by using transaction codes like MB52 or MMBE.
- Adjust Configuration: If the stock type is incorrect, you may need to adjust the configuration in the project system (CJB1, CJB2) or material management (OMJJ) to allow for non-valuated project stock.
- Material Master Settings: Review the material master settings for the relevant materials. Ensure that the valuation type is set correctly and that the material is configured to allow for project stock.
- Use Correct Confirmation Method: If you are using a confirmation method that is not compatible with the stock type, consider using a different method that aligns with the requirements for non-valuated project stock.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration steps related to project stock and production confirmations.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems and material management.
Get instant SAP help. Start your 7-day free trial now.
RM023
Change not possible as similar postprocessing records created
What causes this issue? You are trying to change a postprocessing record so that it would be identical to an already existing postprocessing record.S...
RM022
Production lot &2 is blocked by user &1
What causes this issue? The production lot &V2&, for which you want to carry out a backflush is locked by user &V1&. You may also be ...
RM025
No cost estimate possible for this product cost collector
What causes this issue? No cost estimate is possible because the controlling level of the product cost collector in question is "product cost pl...
RM026
A new costing is carried out for product cost collector &1
What causes this issue? The system has established differences between the current reporting point structure and the milestone structure in the routi...
Click on this link to search all SAP messages.