Do you have any question about this error?
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 026
Message text: A new costing is carried out for product cost collector &1
The system has established differences between the current reporting
point structure and the milestone structure in the routing. In order to
update the routing, the system carries out a preliminary costing for
product cost collector &V1&. The system saves this preliminary costing
and the new reporting point structure when the costing has been carried
out.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If the costing is to be carried out, confirm this message. Otherwise
terminate processing.
You can also carry out the costing manually using a transaction in
product cost collector maintenance.
Error message extract from SAP system. Copyright SAP SE.
RM026
- A new costing is carried out for product cost collector &1 ?The SAP error message RM026, which states "A new costing is carried out for product cost collector &1," typically occurs in the context of product costing and cost collector management in SAP. This message indicates that a new costing run is being initiated for a specific product cost collector, which may not be allowed under certain conditions.
Cause:
- Costing Lock: The product cost collector may be locked for costing due to an ongoing costing run or because it has already been processed.
- Incomplete Data: There may be missing or incomplete data required for the costing process.
- Costing Variant Issues: The costing variant used may not be configured correctly or may not be applicable for the product cost collector.
- Status of Cost Collector: The status of the product cost collector may not allow for a new costing run (e.g., it may be in a closed status).
Solution:
- Check Lock Status: Verify if the product cost collector is locked. You can do this by checking the status of the cost collector in the relevant transaction (e.g., COKA or COSS).
- Complete Data: Ensure that all necessary data for the costing run is complete and accurate. This includes checking material master data, BOMs, routing, and any other relevant information.
- Review Costing Variant: Check the configuration of the costing variant being used. Ensure it is set up correctly and is applicable for the product cost collector in question.
- Change Status: If the product cost collector is in a status that does not allow for new costing, you may need to change its status to allow for costing. This may involve closing previous costings or adjusting the status as per your business process.
- Consult Documentation: Refer to SAP documentation or your organization's internal guidelines for specific procedures related to product costing and cost collectors.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in product costing.
Get instant SAP help. Start your 7-day free trial now.
RM025
No cost estimate possible for this product cost collector
What causes this issue? No cost estimate is possible because the controlling level of the product cost collector in question is "product cost pl...
RM024
Confirmation for prodn lot only poss. in case of nonvaluated proj. stock
What causes this issue? In repetitive manufacturing, backflushing to a production lot is only possible for nonvaluated project stock. The planned ord...
RM027
Inventory Mgmt: Sufficient qties of material & in plant & not available
What causes this issue? The stock determination function could not find sufficient stock of the specified material. Therefore, the complete quantity ...
RM028
Routing &1 &2 &3 contains no reporting points
What causes this issue? According to the <DS:GLOS.3526C4C2AFAB52B9E10000009B38F974>repetitive manufacturing profile</> the reporting poin...