Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 026
Message text: A new costing is carried out for product cost collector &1
The system has established differences between the current reporting
point structure and the milestone structure in the routing. In order to
update the routing, the system carries out a preliminary costing for
product cost collector &V1&. The system saves this preliminary costing
and the new reporting point structure when the costing has been carried
out.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If the costing is to be carried out, confirm this message. Otherwise
terminate processing.
You can also carry out the costing manually using a transaction in
product cost collector maintenance.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message RM026, which states "A new costing is carried out for product cost collector &1," typically occurs in the context of product costing and cost collector management in SAP. This message indicates that a new costing run is being initiated for a specific product cost collector, which may not be allowed under certain conditions.
Cause: Costing Lock: The product cost collector may be locked for costing due to an ongoing costing run or because it has already been processed. Incomplete Data: There may be missing or incomplete data required for the costing process. Costing Variant Issues: The costing variant used may not be configured correctly or may not be applicable for the product cost collector. Status of Cost Collector: The status of the product cost collector may not allow for a new costing run (e.g., it may be in a closed status).
Solution: Check Lock Status: Verify if the product cost collector is locked.
Get instant SAP help. Sign up for our Free Essentials Plan.
RM025 No cost estimate possible for this product cost collector
What causes this issue? No cost estimate is possible because the controlling level of the product cost collector in question is "product cost pl...
RM024 Confirmation for prodn lot only poss. in case of nonvaluated proj. stock
What causes this issue? In repetitive manufacturing, backflushing to a production lot is only possible for nonvaluated project stock. The planned ord...
RM027 Inventory Mgmt: Sufficient qties of material & in plant & not available
What causes this issue? The stock determination function could not find sufficient stock of the specified material. Therefore, the complete quantity ...
RM028 Routing &1 &2 &3 contains no reporting points
What causes this issue? According to the <DS:GLOS.3526C4C2AFAB52B9E10000009B38F974>repetitive manufacturing profile</> the reporting poin...
Click on this link to search all SAP messages.