Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 316
Message text: Detailed or rate-based sched. and sequencing active simultaneously
Detailed or rate-based scheduling and sequecing are all active at the
same time.
You must choosing one scheduling type:
Capacity scheduling (detailed or rate-based planning).
Or, line-based scheduling (sequencing).
You define the scheduling levels for the various types of planned
orders in Customizing:
<DS:TRAN.OPU5>Proceed with functionn</>
The routings in the production version in the material master record
(MRP 4 screen) must be entered according to the scheduling level
settings in Customizing (Determining scheduling and capacity reqmts via
detailed or rate-based planning).
<DS:TRAN.MM02>Proceed with function</>
If you have made any changes, you have to restart the planning table to
activate these changes.
Error message extract from SAP system. Copyright SAP SE.
REMPT316
- Detailed or rate-based sched. and sequencing active simultaneously ?The SAP error message REMPT316 indicates that both detailed scheduling and rate-based scheduling are active at the same time for a production process. This situation is not allowed in SAP, as these two scheduling methods are mutually exclusive.
Cause:
The error occurs when:
To resolve this error, you need to ensure that only one scheduling method is active for the relevant production process. Here are the steps you can take:
Check Order Settings:
Adjust Scheduling Parameters:
Configuration Settings:
Consult Documentation:
Testing:
By following these steps, you should be able to resolve the REMPT316 error and ensure that your production scheduling is configured correctly.
Get instant SAP help. Start your 7-day free trial now.
REMPT315
No prod. dates for material &1, version &2, production line &3
What causes this issue? The planned order has no production dates for the combination of material, production version and production line you specifi...
REMPT314
No capacity requirements were determined (see Customizing)
What causes this issue? No capacity requirements were created for the planned order. This may be as a result of the following: It is set in Customizi...
REMPT320
Capacity category of work center &1 was set to &2
What causes this issue? The basis the system uses for scheduling and to calculate capacity requirements is not the same. A possible explanation is th...
REMPT321
Scheduling and capacity calculation of & have different bases
What causes this issue? The basis used for scheduling and to calculate the capacity requirements are different. This can cause inconsistencies. A pos...
Click on this link to search all SAP messages.