How To Fix RECN056 - Default value was entered for first end date of previous contract (check)


RECN056 - Overview

  • Message type: E = Error

  • Message class: RECN - Messages - Contract

  • Message number: 056

  • Message text: Default value was entered for first end date of previous contract (check)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RECN056 - Default value was entered for first end date of previous contract (check) ?
    The SAP error message RECN056 typically occurs in the context of contract management within the SAP system, particularly when dealing with contract renewals or modifications. This error indicates that the system has automatically populated a default value for the "first end date" of a previous contract, which may not be appropriate or valid in the current context.
    
    Cause: Default Value Assignment: The system is trying to assign a default value for the end date of a previous contract, but this value may not align with the expected business logic or contract terms. Contract Overlap: There may be an overlap in contract dates, or the end date of the previous contract is not set correctly, leading to conflicts.
    Configuration Issues: There might be configuration settings in the contract management module that dictate how end dates are handled, which could be misconfigured.
    Solution: Check Contract Dates: Review the dates of the previous contract to ensure that they are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant