How To Fix QA129 - Enter the start date as well as the end date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: QA - QM : Inspection lots

  • Message number: 129

  • Message text: Enter the start date as well as the end date

  • Show details Hide details
  • What causes this issue?

    In order for you to conduct an inspection, you must know the starting
    date as well as the ending date of the inspection.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message QA129 - Enter the start date as well as the end date ?

    The SAP error message QA129, which states "Enter the start date as well as the end date," typically occurs in the context of Quality Management (QM) processes, particularly when you are trying to create or manage quality notifications, inspections, or other related activities that require date inputs.

    Cause:

    This error arises when the system expects both a start date and an end date to be entered in a specific transaction or screen, but one or both of these dates are missing. This can happen in various scenarios, such as:

    • When creating a quality notification or inspection lot.
    • When trying to set up a quality control plan or inspection plan.
    • When entering data in a report or transaction that requires a date range.

    Solution:

    To resolve the QA129 error, follow these steps:

    1. Check Input Fields: Ensure that both the start date and end date fields are filled in. If you are using a date picker, make sure you select valid dates.

    2. Format: Verify that the dates are in the correct format as expected by the system (e.g., DD/MM/YYYY or MM/DD/YYYY, depending on your system settings).

    3. Logical Dates: Ensure that the start date is earlier than the end date. The system will not accept a scenario where the start date is after the end date.

    4. Transaction Context: Make sure you are in the correct transaction or screen that requires these dates. If you are unsure, refer to the documentation or help resources for the specific transaction.

    5. User Permissions: If you are still facing issues, check if you have the necessary permissions to enter these dates. Sometimes, user roles can restrict certain actions.

    6. Consult Documentation: If the error persists, consult the SAP documentation or help resources specific to the module you are working with for additional guidance.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Transaction Codes: Familiarize yourself with the relevant transaction codes in the QM module, such as QA01 (Create Quality Notification), QA02 (Change Quality Notification), or QA03 (Display Quality Notification).
    • User Training: If you are new to SAP QM, consider training sessions or resources that cover the basics of quality management processes and data entry.

    By ensuring that both the start and end dates are correctly entered and formatted, you should be able to resolve the QA129 error and proceed with your tasks in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author