Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: PSHLP_MSG_CL - Message Class for PS EhP4 Developments
Message number: 078
Message text: ACL of project &1 could not be loaded into the TREX-based cache
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSHLP_MSG_CL078
- ACL of project &1 could not be loaded into the TREX-based cache ?The SAP error message PSHLP_MSG_CL078 indicates that the Access Control List (ACL) of a project could not be loaded into the TREX-based cache. This error typically occurs in the context of SAP Project System (PS) or when using the TREX (Text Retrieval and Information Extraction) search engine.
Causes:
- Authorization Issues: The user may not have the necessary authorizations to access the project or its ACL.
- Project Not Found: The project specified in the error message may not exist or may have been deleted.
- TREX Configuration Issues: There may be a problem with the TREX configuration or its connection to the SAP system.
- Data Corruption: The data related to the project or its ACL may be corrupted or inconsistent.
- System Performance: High system load or performance issues may prevent the ACL from being loaded properly.
Solutions:
- Check Authorizations: Ensure that the user has the necessary authorizations to access the project and its ACL. This can be done by reviewing the user's roles and authorizations in the SAP system.
- Verify Project Existence: Confirm that the project ID mentioned in the error message exists and is active. You can do this by checking the project in the Project System (transaction code CJ20N or CJ03).
- TREX Configuration: Check the TREX configuration and ensure that it is properly set up. You can use transaction code TREX to access the TREX administration tools and verify the settings.
- Rebuild TREX Cache: If the TREX cache is corrupted, you may need to rebuild it. This can often be done through the TREX administration interface or by using specific SAP transactions related to TREX.
- Check System Logs: Review the system logs (transaction code SLG1) for any additional error messages or warnings that may provide more context about the issue.
- Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance. They may have additional insights or patches available for known issues.
Related Information:
By following these steps, you should be able to diagnose and resolve the issue related to the error message PSHLP_MSG_CL078.
Get instant SAP help. Sign up for our Free Essentials Plan.
PSHLP_MSG_CL077
Milestones of network &1 could not be loaded into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSHLP_MSG_CL076
Milestones of project &1 could not be loaded into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSHLP_MSG_CL079
ACL of network &1 could not be loaded into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSHLP_MSG_CL080
Status of project &1 could not be loaded into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.