How To Fix PSHLP_MSG_CL080 - Status of project &1 could not be loaded into the TREX-based cache


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSHLP_MSG_CL - Message Class for PS EhP4 Developments

  • Message number: 080

  • Message text: Status of project &1 could not be loaded into the TREX-based cache

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSHLP_MSG_CL080 - Status of project &1 could not be loaded into the TREX-based cache ?

    The SAP error message PSHLP_MSG_CL080 indicates that the status of a project could not be loaded into the TREX-based cache. This error typically occurs in the context of SAP Project System (PS) and can be related to issues with the TREX (Text Retrieval and Extraction) search engine used by SAP for indexing and searching data.

    Causes:

    1. Data Consistency Issues: There may be inconsistencies or corruption in the project data that prevent it from being loaded into the cache.
    2. TREX Configuration Problems: The TREX system may not be properly configured or may be experiencing issues that prevent it from processing requests.
    3. Authorization Issues: The user may not have the necessary authorizations to access the project data.
    4. System Performance: High load on the system or TREX server may lead to timeouts or failures in loading data.
    5. Missing or Incomplete Data: Required data for the project may be missing or incomplete, leading to failure in loading.

    Solutions:

    1. Check Data Consistency: Use transaction codes like SE11 or SE16 to check the integrity of the project data. Look for any inconsistencies or missing entries.
    2. TREX Administration: Access the TREX administration tools to check the status of the TREX server. Ensure that it is running correctly and that there are no errors in the logs.
    3. Rebuild the Cache: If the cache is corrupted, you may need to rebuild it. This can often be done through the TREX administration interface or by using specific SAP transactions.
    4. Check Authorizations: Ensure that the user has the necessary authorizations to access the project data. This can be checked in the user roles and profiles.
    5. System Performance Monitoring: Monitor the performance of the SAP system and the TREX server. If there are performance issues, consider optimizing the system or increasing resources.
    6. SAP Notes: Check for any relevant SAP Notes that may address this specific error. SAP frequently releases updates and patches that can resolve known issues.

    Related Information:

    • TREX Documentation: Familiarize yourself with the TREX documentation for configuration and troubleshooting.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • SAP Support: If the issue persists, consider reaching out to SAP Support for assistance, providing them with detailed information about the error and the context in which it occurs.

    By following these steps, you should be able to diagnose and resolve the issue related to the PSHLP_MSG_CL080 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker