Message type: E = Error
Message class: PSHLP_MSG_CL - Message Class for PS EhP4 Developments
Message number: 066
Message text: Network &1 is loaded into the TREX-based cache
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSHLP_MSG_CL066
- Network &1 is loaded into the TREX-based cache ?The SAP error message PSHLP_MSG_CL066 indicates that a specific network (in this case, represented by &1) is loaded into the TREX-based cache. This message typically arises in the context of SAP systems that utilize the TREX (Text Retrieval and Extraction) engine for search and indexing functionalities.
Cause: Cache Management: The error suggests that the network is already loaded into the TREX cache, which may prevent further operations or updates until the cache is cleared or refreshed.
Configuration Issues: There may be configuration settings that are not aligned with the expected behavior of the TREX engine. Data Consistency: If there are inconsistencies in the data or if the data has been modified while the cache is still active, this can lead to such messages.
Solution: Clear the TREX Cache: You can clear the TREX cache to remove the loaded network. This can often be done through the SAP GUI or by using specific transaction codes related to
Get instant SAP help. Sign up for our Free Essentials Plan.
PSHLP_MSG_CL065
Project &1 is loaded into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSHLP_MSG_CL064
TREX indexing could not start
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSHLP_MSG_CL067
Error while loading project &1 into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSHLP_MSG_CL068
Error while loading network &1 into the TREX-based cache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.