Do you have any question about this error?
Message type: E = Error
Message class: PRD_SCM_MSGS - Message class for MG-SCM package
Message number: 004
Message text: Maximum Delay in Days must be atleast one day
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PRD_SCM_MSGS004
- Maximum Delay in Days must be atleast one day ?The SAP error message PRD_SCM_MSGS004 indicates that the "Maximum Delay in Days" parameter must be set to at least one day. This error typically occurs in the context of supply chain management (SCM) or production planning when configuring settings related to lead times, delivery schedules, or similar parameters.
Cause:
The error arises when a user attempts to set the "Maximum Delay in Days" parameter to a value less than one day (e.g., zero or negative). This parameter is crucial for ensuring that the system can effectively manage and calculate delays in production or delivery processes.
Solution:
To resolve this error, you need to ensure that the "Maximum Delay in Days" is set to a value of at least one day. Here are the steps to do this:
Access the Configuration Settings:
- Navigate to the relevant configuration area in SAP where the "Maximum Delay in Days" parameter is set. This could be in the SCM module or specific transaction codes related to planning.
Modify the Parameter:
- Locate the field for "Maximum Delay in Days."
- Change the value to at least 1 (one day).
Save Changes:
- After making the necessary adjustments, save the changes to ensure that the new value is applied.
Test the Configuration:
- After saving, perform a test to ensure that the error no longer appears and that the system behaves as expected.
Related Information:
SPRO
for configuration or specific transaction codes related to planning and scheduling.By following these steps, you should be able to resolve the error and ensure that your configuration is set correctly for effective supply chain management.
Get instant SAP help. Start your 7-day free trial now.
PRD_SCM_MSGS003
Maximum Delay in Days has been adjusted to 1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PRD_SCM_MSGS001
Non-delivery penalty has been adjusted.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PREPAY001
Enter a contract
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PREPAY002
No contract exists for selection criteria
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.