How To Fix PRD_SCM_MSGS003 - Maximum Delay in Days has been adjusted to 1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PRD_SCM_MSGS - Message class for MG-SCM package

  • Message number: 003

  • Message text: Maximum Delay in Days has been adjusted to 1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRD_SCM_MSGS003 - Maximum Delay in Days has been adjusted to 1 ?

    The SAP error message PRD_SCM_MSGS003 indicates that the maximum delay in days for a certain process or operation has been adjusted to 1. This typically occurs in the context of Supply Chain Management (SCM) or Advanced Planning and Optimization (APO) modules, where planning and scheduling are critical.

    Cause:

    The error message is usually triggered when the system detects that the planned delay for a certain operation exceeds the configured maximum allowable delay. This can happen due to various reasons, such as:

    1. Configuration Settings: The maximum delay settings in the system may be configured to a very low value (in this case, 1 day).
    2. Data Issues: There may be inconsistencies or errors in the master data, such as lead times, production times, or transportation times.
    3. Planning Parameters: The planning parameters set for the specific product or process may not align with the actual operational capabilities or constraints.
    4. Demand Fluctuations: Sudden changes in demand or supply can lead to delays that exceed the configured limits.

    Solution:

    To resolve this issue, you can take the following steps:

    1. Review Configuration:

      • Check the configuration settings for maximum delay in the relevant planning area. You may need to adjust the maximum delay settings to accommodate realistic operational delays.
      • Navigate to the relevant configuration transaction (e.g., SPRO) and look for settings related to planning parameters.
    2. Analyze Master Data:

      • Review the master data for the affected products, including lead times, production times, and transportation times. Ensure that they are accurate and reflect the actual processes.
      • Correct any discrepancies found in the master data.
    3. Adjust Planning Parameters:

      • If necessary, adjust the planning parameters for the product or process to better align with operational capabilities. This may involve changing safety stock levels, reorder points, or other relevant parameters.
    4. Monitor Demand and Supply:

      • Keep an eye on demand and supply fluctuations. If there are significant changes, consider adjusting your planning strategies to better accommodate these variations.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
    6. Testing:

      • After making adjustments, run a test planning run to ensure that the changes have resolved the issue and that the system behaves as expected.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional guidance.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.
    • Training: Consider training sessions or workshops on SCM/APO configuration and planning to better understand how to manage such issues in the future.

    By following these steps, you should be able to address the error message PRD_SCM_MSGS003 and ensure smoother planning and operations within your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker