    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PQ523 - This falls short of the proposed duration ?

    The SAP error message PQ523, which states "This falls short of the proposed duration," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the actual duration of a task or operation is shorter than what was proposed or planned in the system.

    Cause:

    1. Mismatch in Duration: The actual time taken to complete a task is less than the planned duration. This can happen due to various reasons such as:

      • Inefficient planning or estimation of task durations.
      • Changes in the production process that lead to faster completion times.
      • Incorrect data entry or configuration in the routing or work center.
    2. Routing Issues: The routing defined for the production order may not accurately reflect the actual time required for operations.

    3. Work Center Settings: The settings in the work center may not align with the actual capabilities or efficiencies of the resources being used.

    Solution:

    1. Review and Adjust Planning:

      • Check the planned duration in the routing and compare it with the actual time taken for the operation.
      • If the actual duration is consistently shorter, consider updating the routing to reflect more accurate times.
    2. Update Work Center Data:

      • Review the work center settings to ensure they are configured correctly. This includes checking the standard values for setup, processing, and teardown times.
    3. Analyze Production Process:

      • Investigate the production process to identify any changes that may have led to reduced operation times. This could involve looking at equipment efficiency, workforce skills, or process improvements.
    4. Adjust Production Orders:

      • If necessary, adjust the production orders to align with the new durations. This may involve re-scheduling or re-planning the operations.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on handling PQ523 errors, as there may be additional context or steps relevant to your specific SAP version or configuration.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CO02 (Change Production Order) or CA01 (Create Routing) to make necessary adjustments.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Forums: Engage with SAP community forums or user groups for shared experiences and solutions from other users who have encountered the same error.

    By following these steps, you should be able to resolve the PQ523 error and ensure that your production planning aligns more closely with actual performance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • PQ522 Enter a start date
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PQ521 Specify a time period
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PQ524 Preparation has been completed
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PQ525 You specified an invalid state
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker