How To Fix PQ057 - Number of planning days exceeds period specified (number adjusted to max)


PQ057 - Overview

  • Message type: E = Error

  • Message class: PQ - HR-PD: Personnel Development

  • Message number: 057

  • Message text: Number of planning days exceeds period specified (number adjusted to max)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PQ057 - Number of planning days exceeds period specified (number adjusted to max) ?
    The SAP error message PQ057, which states "Number of planning days exceeds period specified (number adjusted to max)," typically occurs in the context of production planning or capacity planning within the SAP system. This error indicates that the number of planning days you are trying to set exceeds the maximum limit defined for the planning period in the system.
    
    Cause: Exceeding Maximum Planning Days: The number of planning days you are trying to use in your planning run exceeds the maximum number of days allowed for the planning period. Configuration Settings: The settings in the planning parameters or the configuration of the planning strategy may not align with the number of days you are trying to plan for. Master Data Settings: The master data for the material or resource may have restrictions that limit the planning horizon.
    Solution: Adjust Planning Days: Review the number of planning days you are trying to set and adjust it to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant