How To Fix PQ058 - Enter the planning end date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PQ - HR-PD: Personnel Development

  • Message number: 058

  • Message text: Enter the planning end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PQ058 - Enter the planning end date ?

    The SAP error message PQ058, which states "Enter the planning end date," typically occurs in the context of production planning or project management within the SAP system. This error indicates that the system requires a planning end date to be specified for a particular planning activity or project.

    Cause:

    The error is triggered when:

    1. A user attempts to create or modify a planning scenario, but the planning end date field is left blank.
    2. The system requires this date to determine the timeframe for planning activities, resource allocation, or scheduling.

    Solution:

    To resolve the PQ058 error, you should:

    1. Identify the Planning Activity: Determine which planning activity or project you are working on that triggered the error.
    2. Enter the Planning End Date:
      • Navigate to the relevant screen where the planning details are entered.
      • Locate the field for the planning end date.
      • Enter a valid date that represents the end of the planning period.
    3. Save Changes: After entering the date, save your changes and try to proceed with the planning activity again.

    Related Information:

    • Field Requirements: Ensure that you understand the requirements for the planning end date in your specific context, as it may vary based on the type of planning (e.g., production orders, project planning).
    • Documentation: Refer to SAP documentation or help files for more details on the specific transaction or module you are working with.
    • User Permissions: Ensure that you have the necessary permissions to make changes to planning data in SAP.
    • Consult with Colleagues: If you are unsure about what date to enter, consult with your project manager or colleagues who are familiar with the planning process.

    If the issue persists after following these steps, it may be beneficial to consult your SAP support team or refer to SAP Notes for any known issues related to this error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant