Do you have any question about this error?
Message type: E = Error
Message class: PPH_MRP -
Message number: 408
Message text: Problem occurred: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP408
- Problem occurred: &1 ?The SAP error message PPH_MRP408 typically indicates a problem related to the Material Requirements Planning (MRP) process. The message usually includes a specific identifier (represented by
&1
) that provides more context about the issue. Here’s a general breakdown of the cause, potential solutions, and related information for this error:Cause:
- Data Issues: The error may arise due to missing or incorrect data in the material master, BOM (Bill of Materials), or routing.
- Configuration Problems: Incorrect settings in MRP configuration can lead to this error.
- Planning File Issues: Problems with the planning file entries can also trigger this error.
- Locking Issues: If another process is locking the data that MRP needs to access, it can cause this error.
- Material Status: The material might be set to a status that prevents it from being planned (e.g., "Blocked" or "Inactive").
Solutions:
- Check Material Master Data: Ensure that the material master data is complete and correct. Verify that all necessary views (MRP, Basic Data, etc.) are properly maintained.
- Review BOM and Routing: Check if the BOM and routing for the material are correctly defined and active.
- MRP Configuration: Review the MRP configuration settings in the system to ensure they are set up correctly.
- Planning File Entries: Use transaction code MD21 to check the planning file entries for the material and ensure they are correctly set.
- Check for Locks: Use transaction SM12 to check for any locks on the material that might be causing the issue.
- Material Status: Verify the status of the material in the material master. If it is blocked or inactive, update the status accordingly.
Related Information:
If the error persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP's support portal for more specific guidance based on the exact context of the error message.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP407
Number of materials selected for planning: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP406
Creation of planning proposals in past allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP409
Scope: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP410
BOM components: &1, stock transfer materials: &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.