Message type: E = Error
Message class: PPH_MRP -
Message number: 406
Message text: Creation of planning proposals in past allowed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message PPH_MRP406, which states "Creation of planning proposals in past allowed," typically occurs during the Material Requirements Planning (MRP) process. This message indicates that the system is allowing the creation of planning proposals (such as purchase requisitions or production orders) for dates that are in the past, which is generally not advisable in a standard MRP process.
Cause: Configuration Settings: The MRP settings in the system may be configured to allow planning proposals for past dates. This can happen if the planning parameters are not set correctly. Material Master Data: The material master data may have settings that allow for past planning, such as incorrect lead times or planning horizons. MRP Type: The MRP type assigned to the material may allow for past planning proposals. Planning Strategy: The planning strategy used for the material may not restrict past planning.
Solution: Review MRP Configuration: Check the MRP configuration settings in the system. Ensure that the planning
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP405
Regenerative with planning mode: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP404
Non-regenerative with planning mode: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP407
Number of materials selected for planning: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP408
Problem occurred: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.