How To Fix PPH_MRP406 - Creation of planning proposals in past allowed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 406

  • Message text: Creation of planning proposals in past allowed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_MRP406 - Creation of planning proposals in past allowed ?

    The SAP error message PPH_MRP406, which states "Creation of planning proposals in past allowed," typically occurs during the Material Requirements Planning (MRP) process. This message indicates that the system is allowing the creation of planning proposals (such as purchase requisitions or production orders) for dates that are in the past, which is generally not advisable in a standard MRP process.

    Cause:

    1. Configuration Settings: The MRP settings in the system may be configured to allow planning proposals for past dates. This can happen if the planning parameters are not set correctly.
    2. Material Master Data: The material master data may have settings that allow for past planning, such as incorrect lead times or planning horizons.
    3. MRP Type: The MRP type assigned to the material may allow for past planning proposals.
    4. Planning Strategy: The planning strategy used for the material may not restrict past planning.

    Solution:

    1. Review MRP Configuration:

      • Check the MRP configuration settings in the system. Ensure that the planning parameters are set to restrict planning proposals to future dates.
      • You can access the MRP configuration through transaction code SPRO and navigate to the relevant sections.
    2. Check Material Master Data:

      • Review the material master data for the affected materials. Ensure that the lead times, planning horizons, and other relevant fields are set correctly.
      • Use transaction code MM03 to view the material master data.
    3. Adjust MRP Type:

      • If the MRP type allows for past planning, consider changing it to a type that restricts this behavior. You can check the MRP type in the material master data.
    4. Modify Planning Strategy:

      • If the planning strategy allows for past planning, consider changing it to a more appropriate strategy that aligns with your business processes.
    5. Run MRP Again:

      • After making the necessary changes, run the MRP process again to see if the error persists.

    Related Information:

    • Transaction Codes:

      • MD01: MRP Run
      • MM03: Display Material Master
      • SPRO: Customizing (Configuration)
    • Documentation: Refer to SAP Help documentation for detailed information on MRP configuration and material master settings.

    • User Exits and BAdIs: If the standard configuration does not meet your requirements, consider implementing user exits or Business Add-Ins (BAdIs) to customize the MRP behavior.

    • Testing: Always test changes in a development or quality assurance environment before applying them to the production system to avoid unintended consequences.

    By following these steps, you should be able to address the PPH_MRP406 error and ensure that planning proposals are created only for future dates.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant