Do you have any question about this error?
Message type: E = Error
Message class: PPH_MRP -
Message number: 407
Message text: Number of materials selected for planning: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP407
- Number of materials selected for planning: &1 ?The SAP error message PPH_MRP407 indicates that the number of materials selected for planning exceeds the maximum limit set in the system. This can occur during the Material Requirements Planning (MRP) process when the system attempts to plan a large number of materials simultaneously.
Cause:
- Exceeding Limits: The system has a predefined limit for the number of materials that can be processed in a single planning run. If the number of materials exceeds this limit, the error will be triggered.
- Configuration Settings: The limit may be configured in the system settings, and it might be set too low for the volume of materials you are trying to plan.
- Selection Criteria: The selection criteria used for the planning run may inadvertently include too many materials.
Solution:
Adjust Selection Criteria: Review and modify the selection criteria for the planning run to reduce the number of materials being processed at one time. This can be done by filtering based on specific criteria such as material type, plant, or other relevant parameters.
Batch Processing: If you have a large number of materials to plan, consider breaking them into smaller batches and running the MRP process multiple times for each batch.
Configuration Changes: If necessary, consult with your SAP Basis or configuration team to review and potentially increase the limit for the number of materials that can be selected for planning. This may involve changes in the configuration settings related to MRP.
Check for Updates: Ensure that your SAP system is up to date with the latest patches and updates, as there may be improvements or changes in newer versions that address this issue.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on MRP settings and limits.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP406
Creation of planning proposals in past allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP405
Regenerative with planning mode: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP408
Problem occurred: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP409
Scope: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.