Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP233
- Scheduling error occured, check master data of plan ?The SAP error message PPH_MRP233, which indicates a scheduling error, typically arises during the planning or scheduling processes in SAP's Production Planning (PP) or Material Requirements Planning (MRP) modules. This error suggests that there is an issue with the master data related to the planning object, such as a material, production order, or routing.
Causes of the Error
Missing or Incomplete Master Data:
- The material master data may be incomplete or missing essential information, such as lead times, production versions, or BOM (Bill of Materials) details.
Incorrect Routing:
- The routing for the production process may not be defined correctly, or it may be missing necessary operations or work centers.
Capacity Issues:
- Work centers may not have sufficient capacity defined, or there may be conflicts in scheduling due to capacity overload.
Invalid Dates:
- The planned start or finish dates may be outside of acceptable ranges, or there may be conflicts with other scheduled activities.
Configuration Issues:
- There may be configuration issues in the MRP settings or in the planning strategy that affect how scheduling is performed.
Solutions
Check Master Data:
- Review the material master data for the affected material. Ensure that all relevant fields are filled out correctly, including lead times, production versions, and BOMs.
- Verify that the routing is complete and correctly defined, including all necessary operations and work centers.
Review Work Center Capacity:
- Check the capacity settings for the work centers involved in the production process. Ensure that they have sufficient capacity to handle the planned production.
Validate Dates:
- Ensure that the planned start and finish dates are valid and do not conflict with other scheduled activities. Adjust the planning parameters if necessary.
Check MRP Configuration:
- Review the MRP configuration settings to ensure they are set up correctly for the planning strategy being used.
Run MRP Again:
- After making the necessary corrections, run the MRP process again to see if the error persists.
Related Information
Transaction Codes:
MM03
(Material Master), CA03
(Routing), and CR02
(Change Work Center) to review and edit master data.Logs and Traces:
SAP Notes:
Documentation:
By systematically checking these areas, you should be able to identify and resolve the cause of the PPH_MRP233 error.
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP232
Discontinuation: required beyond date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP231
Version controlled BOMs and routings not supported in MRP Live
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP234
Planning in classic MRP aborted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP235
Quota quantities exceeded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.