How To Fix PPH_MRP232 - Discontinuation: required beyond date


PPH_MRP232 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 232

  • Message text: Discontinuation: required beyond date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPH_MRP232 - Details

  • The SAP error message PPH_MRP232, which states "Discontinuation: required beyond date," typically occurs in the context of Material Requirements Planning (MRP) when there is a discontinuation date set for a material that is being planned or procured. This error indicates that the system has identified a situation where the material is marked for discontinuation, but the planning or procurement process is attempting to schedule requirements beyond the specified discontinuation date.
    
    Cause: Discontinuation Date Set: The material has a discontinuation date that is earlier than the date for which the MRP is trying to create a requirement. Planning Horizon: The planning horizon may extend beyond the discontinuation date, leading to a conflict. Incorrect Master Data: The material master data may not be correctly maintained, leading to inconsistencies in planning.
    Solution: Review Discontinuation Date: Check the material master record for the discontinuation date. If the date is set incorrectly, you may need to adjust it. Transaction Code: MM02 (Change

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPH_MRP232 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker