How To Fix PPH_MRP230 - Material exchange: no demand driven planning allowed


PPH_MRP230 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 230

  • Message text: Material exchange: no demand driven planning allowed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPH_MRP230 - Details

  • The SAP error message PPH_MRP230 ("Material exchange: no demand driven planning allowed") typically occurs in the context of Material Requirements Planning (MRP) when there is an attempt to perform a material exchange for a material that is configured for demand-driven planning. This error indicates that the system does not allow the exchange of materials under the current planning settings.
    
    Cause: Demand-Driven Planning Configuration: The material in question is set up for demand-driven planning, which means it is managed differently than standard MRP materials. Demand-driven planning often involves specific settings that restrict certain operations, including material exchanges. Material Master Settings: The material master record may have specific settings that prevent the exchange of materials, particularly if it is marked for demand-driven planning. Planning Strategy: The planning strategy assigned to the material may not support material exchanges. For example, certain strategies are designed for make-to-stock or make-to-order scenarios and may not allow for flexibility in material

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPH_MRP230 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker