Message type: E = Error
Message class: PPH_MRP -
Message number: 186
Message text: No valid BOM status (T415S-KZAMS) for sales order or project
The status of the BOM determined by MRP Live on HANA for the sales order
or the project is not valid.
The system plans the material again in classic MRP.
To avoid this situation in future where the material is planned twice,
you should check the BOM status.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message PPH_MRP186, which indicates "No valid BOM status (T415S-KZAMS) for sales order or project," typically arises in the context of Material Requirements Planning (MRP) when the system cannot find a valid Bill of Materials (BOM) status for a specific sales order or project. This can occur for several reasons, and understanding the cause is essential for resolving the issue. Causes: BOM Status Not Set: The BOM for the material in question may not have a valid status assigned in the T415S table, which is used to manage BOM statuses. BOM Not Created or Active: The BOM may not exist for the material or may not be active for the specific plant or sales order. Sales Order or Project Configuration: The sales order or project may not be correctly configured to reference the BOM. Material Master Data Issues: There may be issues with the material master data that prevent the BOM from being
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP185 No valid BOM status (T415S-KZAMS)
What causes this issue? The status of the BOM determined by MRP Live on HANA is not valid.System Response The system plans the material in classic M...
PPH_MRP184 No valid BOM for phantom material
What causes this issue? MRP Live on HANA could not find a valid BOM for the required quantity and date of the phantom material.System Response The s...
PPH_MRP187 Configurable material and configuration is missing
What causes this issue? The BOM of a configurable material cannot be exploded if no configuration data exists. For example, the material was not conf...
PPH_MRP188 Error in BOM explosion
What causes this issue? An error has occurred during BOM explosion in MRP Live on HANA.System Response The system plans the material again in classi...
Click on this link to search all SAP messages.