Message type: E = Error
Message class: PPH_MRP -
Message number: 188
Message text: Error in BOM explosion
An error has occurred during BOM explosion in MRP Live on HANA.
The system plans the material again in classic MRP.
You should check the BOM.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPH_MRP188
- Error in BOM explosion ?The SAP error message PPH_MRP188, which indicates "Error in BOM explosion," typically occurs during the Material Requirements Planning (MRP) process when the system encounters issues while trying to explode a Bill of Materials (BOM). This can happen for various reasons, and understanding the cause is crucial for resolving the issue.
Causes of PPH_MRP188 Error
Missing BOM: The BOM for the material being processed may not exist or may not be valid for the specific plant or production version.
Incorrect BOM Status: The BOM might be in a status that prevents it from being used, such as being marked for deletion or not being released.
Invalid Components: One or more components in the BOM may be missing, inactive, or have incorrect data (e.g., invalid material numbers).
Plant-Specific Issues: The BOM may not be assigned to the correct plant or may not be valid for the specific plant being used in the MRP run.
Versioning Issues: If multiple versions of a BOM exist, the system may be trying to access a version that is not valid or not active.
Configuration Issues: There may be configuration issues in the MRP settings or in the BOM settings that prevent proper explosion.
Solutions to PPH_MRP188 Error
Check BOM Existence: Verify that the BOM exists for the material in question. You can do this using transaction code CS03 (Display BOM) to check if the BOM is correctly defined.
Review BOM Status: Ensure that the BOM is released and not marked for deletion. You can check the status in the BOM details.
Validate Components: Check the components listed in the BOM for any discrepancies. Ensure that all components are valid and active.
Plant Assignment: Confirm that the BOM is assigned to the correct plant and that the plant is specified in the MRP run.
Check Versioning: If multiple BOM versions exist, ensure that the correct version is being used. You can specify the version in the MRP settings.
MRP Configuration: Review the MRP configuration settings to ensure they are set up correctly. This includes checking the MRP type, lot size, and other relevant parameters.
Run MRP in Debug Mode: If the issue persists, consider running the MRP in debug mode to get more detailed information about where the error occurs.
Consult SAP Notes: Check the SAP Support Portal for any relevant notes or patches that may address this specific error.
Related Information
By following these steps, you should be able to identify the root cause of the PPH_MRP188 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP187
Configurable material and configuration is missing
What causes this issue? The BOM of a configurable material cannot be exploded if no configuration data exists. For example, the material was not conf...
PPH_MRP186
No valid BOM status (T415S-KZAMS) for sales order or project
What causes this issue? The status of the BOM determined by MRP Live on HANA for the sales order or the project is not valid.System Response The sys...
PPH_MRP189
Class item with cat.&1 for BOM comp.&2 not supported in MRP Live on HANA
What causes this issue? The BOM contains a class item. However, class items are not supported in MRP Live on HANA.System Response The system plans t...
PPH_MRP190
Direct proc. with cat. &1 for comp. &2 not supported in MRP Live on HANA
What causes this issue? The BOM contains direct procurement items. However, direct procurement items are not supported in MRP Live on HANA.System Re...
Click on this link to search all SAP messages.